Friday, December 25, 2009

The Timber Frame House

This house was made possible with the help
from all the boys of Zirnhelt Timber Frames
and Harrison Design.

http://www.zirnhelttimberframes.com/index.htm

THIS IS THE HOUSE








































AND IN THIS WAY HAPPENED
















At the beginning was an empty site.
















Here came an excavator















The foundation is shaping















The concrete goes in foundation walls
















The septic system is installed
















The heating system is installed
















The slab is poured
















The structure elements are cut and waiting in the workshop
















The frame is going up































The structure is ready
































Craftsmenship in frame details
































The windows and doors are installed






























With the roof, windows and doors on,
we are ready for Christmas Break
















And here we are at the end of our project,
after 16 month of worry and work.