from all the boys of Zirnhelt Timber Frames
and Harrison Design.
http://www.zirnhelttimberframes.com/index.htm
THIS IS THE HOUSE



AND IN THIS WAY HAPPENED
At the beginning was an empty site.
Here came an excavator
The foundation is shaping
The concrete goes in foundation walls
The septic system is installed
The heating system is installed
The slab is poured
The structure elements are cut and waiting in the workshop
The frame is going up
The structure is ready
Craftsmenship in frame details
The windows and doors are installed
With the roof, windows and doors on,
we are ready for Christmas Break
And here we are at the end of our project,
after 16 month of worry and work.